News

08.10.2010 KT&G Factory Opening ceremony

27.01.2010 Steve Wood visited the building site of the Tobacco Factory "KT&G Rus"

11.01.2010 KT&G. Beginning of internal fire-fighting waterline installation

08.01.2010 KT&G. Beginning of installation the balanced system of ventilation

08.12.2009 Contract with KOYA Company is concluded

01.12.2009 KT&G. Beginning of electrical works

11.11.2009 KT&G. Beginning of floor concrete casting

09.11.2009 KT&G. Beginning of wall sandwich panels installation

01.11.2009 KT&G. Beginning of roof installation

13.10.2009 KT&G. Installation of first beam of metal frame


Новости 1 - 10 of 15
First | Prev. | 1 2 | Next | Last All